Serial number

project name

Build

Construction content and scale

Starting year

plan

Plan for 2021

Happening

Total investment

invest

total

5165.9

1143.5

one

Industry

(one)

Strategic emerging industry

1

Aerospace digital lithium iron phosphate battery cell

Newly built

The building area is about 135,000 square meters, and the annual output of 5gWh iron phosphate battery cell

2021-2023

twenty two

5

2

Precision component

Build nearly 300,000 square meters of production plants, office houses, scientific research buildings and affiliated houses, with an annual output of 3 million flexible circuit boards (sets)

50

8

3

Huijin Optical Class Hardrochemical and ITO conductive film

The building area is 12,000 square meters, the annual ITO transparent conductive film is 2.5 million square meters, and the annual output of 6 million square meters of photore

2021-2022

4

G12 Aneng G12 large -sized high -efficiency silicon wafer

The building area is 85,000 square meters, with an annual output of 3GW single crystal slice, 4GW G12 high -efficiency PERC+photovoltaic battery and 2GW G12 stacking tile components

Saidless cobalt lithium ion battery

Building area of ​​33,700 square meters, an annual output of 6GWH cobalt -free new GT lithium -ion battery

30

6

Heamanmonium electronic component

The total construction area is 22,000 square meters, and the annual output of electronic components, communication devices and modules of 50 million pieces (set) or above

10

7

New Vision LED display

The rental plant is 7,000 square meters, with an annual output of 2.6 million LED modules

1.5

Canhong Electronic Component

The rental plant is 8,000 square meters, with an annual output of LCD-TV, backlight module, and mobile phone screens of more than 100 million sets

2021

9

Huaneng distributed fiber fiber sensor

Renewal

The building area is 60,000 square meters, and the annual output of 1200 kilometers distributed fiber cable

2020-2021

3.5

2.3

Easy Lithium ion battery

Building area of ​​40,700 square meters, an annual output of 1GWH lithium battery

11

Deep Intelligence New Energy Energy Storage Power Station

The construction area is 21,000 square meters, the construction energy storage cabinet area is about 66,000 square meters, and the first phase of the construction of 200MW/800MWH energy storage power station, 20MW photovoltaic power station; the construction of 150MW/600MWH energy storage power station, 15MW photovoltaic power station

2021-2024

35

12

Rainbow lithium battery positive pole material

The building area is 7,800 square meters, and the annual output of 3,000 tons of lithium battery high -performance non -cobalt -free ternary positive pole material

20

13

Lizhong New Materials and Base Station Datoming Components

The building area is 150,000 square meters, and the annual output of 7 million base stations is 7 million pieces

14

Yangzhou Baosheng New Equipment Cable

-1

Baosheng New Equipment Cable Production Testing Center

Newly -built high -end equipment and cable intelligent manufacturing plants such as aerospace and locomotive and vehicle 40,000 square meters, newly -built -of -cable R & D testing and experimental factories 33,000 square meters, forming rail transit, locomotive vehicles, aerospace and 5G communication base stations and other high -end equipment use cables and use. Key material production capacity is 15 billion yuan

-2

Baosheng (Yangzhou) R & D Innovation Center

The construction area is 150,000 square meters. Construction of high -voltage ultra -high -voltage cables and systems, marine engineering cables, aerospace road cables and components, new cable new materials, cable intelligent manufacturing and other high -end cable innovation research and development and technical consulting, engineering design, manufacturing and sales , Install operation and maintenance service platform

2.5

15

Yangzhou Bear CC18-180 series aircraft and aviation parts

The construction area is 60,000 square meters, and the annual output of 300 CC18-180 series aircraft and aviation parts

16

Northern Sanshan Composite Protection Material

The construction area is 15,000 square meters, the annual output of special ceramics such as 1,000 tons of bulletproof ceramics, an annual output of 300,000 sets of human bulletproof plug -in board, and an annual output of 5,000 square meters of special composite armor plate

1.2

17

Jinghua Solar Photovoltaic Component

The building area is 35,000 square meters, and the annual output of 4.5 million solar photovoltaic components

18

Three Pharmaceutical Production

The construction area is 37,000 square meters, the annual production capsule is 500 million capsules, the tablets of 1 billion tablets, the particle doses of 200 million bags, the anti -tumor tablets (capsules) 10 million tablets, 50 million children’s medicines, 500 million injections, 500 million branches

2020-2024

19

Yangzhou Zhongyuan Shipping Heavy Industry LNG ship, dual fuel new ship

Upgrade and transformation of the existing docks, build a pipe workshop, welding workshop and coating workshop. 4 LNG ships and 4 new fuel ships with independent development and development of annual output

Bo Zhi Robot Intelligent Manufacturing

Construction area of ​​250,000 square meters, construction of industrial robot manufacturing factories, service robot manufacturing factory, special robot manufacturing plant, robot sharing factory, smart manufacturing plant, etc.

2020-2025

twenty one

Dan Rui Telecom Fiber Transmission Equipment

Rent 10,000 square meters of plant, 5,000 (set) optical fiber transmission equipment per year

ZTE Pie can lithium -ion battery

The construction area is 178,000 square meters, and the annual output of 4GWH lithium ion battery and 3GWH system generation

2020-2022

twenty three

Elianda high precision printing line board

The building area is 40,000 square meters, and the annual output of 1.35 million square meters of high precision printing line board

twenty four

Veze Electronic Parts Vacuum Coating

The rental plant is about 20,000 square meters, and the annual output of 30 million pieces of 3C metal parts vacuum coating processing products

25

Mingtai film

The building area is 12,000 square meters, and the annual output of 70 million square meters of film

26

Norty Functional Optoelectronics Film

The building area is 8,000 square meters, and the annual output of 18 million square meters of functional photoelectric film

27

Kunqian’an server

The building area is 10,000 square meters, and the annual output of 50,000-100,000 units

28

Wanjun functional photoelectric film

New production and auxiliary rooms are 5486 square meters, and after completion, the production capacity of 470 million square meters of functional photoelectric film is formed

29

Yizheng Jiangyang ultra -high voltage flexible DC cable

The building area is 400,000 square meters, the annual output of 220kV and above ultra -high voltage flexible DC cable is 3,000 kilometers, 110kV high -voltage cables are 8,000 kilometers, and 20,000 kilometers of special cables

Zhongxing Beidou Business Remote Sensing Satellite Satellite

The construction area is 40,000 square meters, and the construction of a satellite remote sensing control center, the data machine room, the production workshop, etc., the annual output of 50 commercial micro -nano satellites, the annual output of 25 commercial rockets, etc.

100

31

Seven Gourd Medical RF ablation therapy instruments

The construction area is 44,000 square meters, and the annual output of 100,000 sets of radio frequency anti -fusion electrons and medical radio frequency ablation therapy instruments

32

Evergrande Sanyuan Soft Bag Power Lithium Battery

The construction area is 287,000 square meters, and the annual output of 1.2 billion watt -time triple lithium battery

2020-2023

33

Hengda Hara BMS battery management system

Rent 10,000 square meters of Evergrande New Energy Battery Factory, with an annual output of 700,000 sets of integrated circuit chips

34

Wanfang Electronic Information System Equipment

The construction area is 48,900 square meters, and 5,000 units (sets) are equipped

Yunpu Health Rehabilitation Robot

The construction area is 20,000 square meters, the annual output of 2,000 subordinates rehabilitation robots, and 5,000 disinfection robots

36

East Bay Biological Biological Biosteen New Materials

The building area is 59,000 square meters, and the annual output of 80,000 tons of plasticized organisms can degrade new materials

37

Huaguang rubber and plastic new energy vehicle pipeline

The construction area is 28,200 square meters, and the annual output of new energy vehicle pipelines 3 million units

1.6

38

Yangzhou Oliwei Automobile MEMS pressure sensor

The building area is 150,000 square meters, and 80,000 sets

5.5

39

New Materials of Degradable Biological Bio -Base Composite Fiber Materials

The building area is 120,000 square meters, and the annual output of 100,000 tons of degradable biological base composite fiber new materials

40

Yangzhou Aviation Carbon Fiber Aviation Core component

The building area is 105,000 square meters, 20 drone bodys of more than 4 tons of annual production, 24 manned special aircraft, 180 aircraft propeller, 180 antenna cover, etc.

41

Yangjie 8 -inch cars and electrical electronic chips

The building area is 120,000 square meters, the annual output semiconductor device is 480,000 pieces, and the surface paste device is 19200KK

2019-2023

42

Yangzhou Deheng Computer Peripheral Equipment Manufacturing

The building area is 180,000 square meters, and the annual output calculation of 3,000 sets of peripheral equipment

2021-2025

43

Fengsheng wind power generation equipment supporting facilities

The building area is 12,000 square meters, and the annual production wind tower platform is 4,500 tons

44

Zhenhua electrolytic capacitor

The construction area is 40,000 square meters, and the annual production capacitor is 1.5 billion

45

Xinyuan Regenerative Plastic Granules

The building area is 28,000 square meters, and the annual output of 100,000 tons of recycled plastic particles

5.3

3.8

46

Haichang New Material 5G Ceramic Filter

The building area is 95,000 square meters, and the annual output of 5G ceramic filter 5.5 million sets

4.6

47

Orete solid institution

The building area is 100,000 square meters, with an annual output of 4.9 tons of respiratory system, cardiovascular and anti -AIDS drugs, an annual output of 28.1 tons of antibacterial and anti -inflammatory ingredients, an annual output of 7 tons of diabetes, and an annual output of 5 million bottles of frozen dry preparations

2019-2021

48

Eddie Materials

The construction area is 40,000 square meters, the annual output of 5 tons of Zuo Yican ingredients, 1.5 tons of ACC006 ingredients, and 4 tons of ACC007 ingredients

2.4

49

Librarous Materials and Preparation

The building area is 80,000 square meters, the annual producer and the raw material drugs of the beast 768 tons, the carbonate Saviham 10 million tablets, the eye drops of 150 million pieces, the beast loose 500 tons, the beast for 90 million tablets

Jerer New Energy Vehicle Electronics and high -power semiconductor wafers

The building area is 50,000 square meters, and the annual output of 12 million pieces of new energy vehicle electronics and high -power semiconductor wafers

51

Ruiming Precision Measurement Instrument

The building area is about 80,000 square meters, and the annual output precision measurement instrument and high -precision equipment 500 sets

52

Fengming Aviation Equipment Constitution

The building area is 6,000 square meters, and the annual output of aviation equipment structure is 50,000 pieces

53

Jiangyang Special Cable

The building area is 29,000 square meters, and the annual output of 12,000 kilometers of special cable

54

Yiyi Intelligent Power Equipment

The construction area is about 15,000 square meters, the annual output of 200 sets of intelligent cable conveyor, and 30 sets of smart cable Zhang equipment

55

Shangde 5GW solar component

The building area is about 30,000 square meters, and the annual output of 2.5GW solar photovoltaic components

4.5

3.9

56

Yangzhou Jing’ao High -efficiency Photovoltaic Battery and Components

The planned total construction area is about 230,000 square meters. The first phase of the planned battery capacity is 6GW; the second phase forms the annual production capacity of 6GW of high -efficiency components;

60

57

Sinochemful ternary lithium battery phase first phase

The building area is about 35,000 square meters, and the annual output of 2GW ternary lithium battery

58

Germany Bergman Medical Food and Medical Products

The construction area is 30,000 square meters, and the annual output of 45 million bottles of biomedical food and 20,000 sets of medical equipment

1.8

59

Dry Honghuang MINILED, Microled chip

The project is divided into two phases. The first phase of the new plant is 30,000 square meters, and the annual output of 500 billion yuan of red and yellow MINILED and MicroLED chip projects; the second -phase project is about 80,000 square meters, and the annual output of 500 billion pieces of red and yellow mining, MicroLED chip chip,

Yongdao electronic label expansion and technical reform

The new facilities such as new factories and warehouses are about 15,500 square meters, with an annual output of 5 billion electronic labels. The original construction area is 31,000 square meters. Electronic tags

10.2

(two)

Advanced manufacturing

61

Sinopec Yicheng Fiber’s annual output of 5 million tons of short -process PTA

Newly built and rebuilt production and auxiliary houses of 193,000 square meters, with an annual output of 5 million tons of PTA

160

62

Changlian Chemical Electronic Products

The construction area is 44,000 square meters, and the annual output of 126,000 tons of electronic chemical production devices and supporting facilities

10.5

63

Fomatfluoro material

New plant buildings are about 8,000 square meters. It is planned to buy about 156 (sets) such as frozen units, steam overheating furnaces, polymerization kettles, and mode compressors.

3.6

64

China Chemical Plastics annual output of 56,000 tons of ABS modified plastic

It is planned to build a new plant about 20,800 square meters, and the annual output of 56,000 tons of ABS modified plastic

65

Zhengde Electric Motor Shell Machinery Manufacturing

The building area is 25,000 square meters, the annual output of 800,000 sets of motor shells, 200,000 sets of gearbox housing, 1 million molds, 500,000 sets of construction machinery

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

twenty two

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

2

2

2

2

2

2

2

2

2

2

2

50

50

8

8

8

3

3

3

3

3

3

3

3

3

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

30

30

30

30

30

30

30

6

6

10

10

10

10

10

10

10

10

10

10

1.5

1.5

1.5

1.5

1.5

1.5

2021

2021

2021

2021

2021

2021

2021

2021

2021

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

2020-2021

2020-2021

2020-2021

2020-2021

2020-2021

3.5

3.5

11

2021-2024

2021-2024

35

35

20

15

1.2

1.2

1.2

1.2

2020-2024

2020-2022

100

32

32

2020-2023

2020-2023

36

2021-2025

2019-2021

60

2020-2021

2.3

1

66

Hong Zhen’s car hinge hinge blank part

Renewal

The building area is 37,000 square meters, and the annual output of 50,000 tons of vehicle hinge blank parts

2020-2022

3.1

1.1

67

Lingyun Hengjin Automobile Parts

Newly built

The building area is 8,000 square meters, and 8.75 million car parts are produced an annual output

2021-2022

1.5

68

Zhongrui Automobile Parts

The construction area is 20,000 square meters, and the annual output of 400,000 sets of automobile parts

1.7

69

Collaborative animal feed

Building area of ​​10,000 square meters, annual output of 100,000 tons of feed and pet food

3

70

Jinjiu casual food

The building area is 114 million square meters, the annual output of 10,000 tons of sauce braised pork products and 8,000 tons of fruit and vegetable juice drink

2021

71

Ruitu polyester with core cloth

The building area is 10,400 square meters, and the annual output of 6,000 tons of core cloth

72

East race prefabricated building mold

The building area is 20,000 square meters, and the annual output of 15,000 tons of assembly component mold

1.6

73

Eapida high and low voltage electrical cabinet

The building area is 11,000 square meters, and the annual output of 20,000 sets of high and low voltage electrical cabinets

74

Infantance and construction machinery and equipment

The building area is 100,000 square meters, and the annual output of 50,000 units of construction machinery and equipment

2021-2023

5

2

75

Henglu 3D upright cotton

The building area is 16,800 square meters, and the annual output of 300 tons of 3D upright cotton

1.2

76

Yuxiang’s new environmental protection building materials

The building area is 16,000 square meters, the annual output of 1 million square meters of light wall board, 100 million yuan of self -guaranteed temperature sintering block bricks

77

Zhongli TEPT compound template

The building area is 28,000 square meters, and the annual output of 5700 tons of TEPT composite template

78

Zhongxiang stainless steel pipe and complete equipment

The building area is 13,000 square meters, and 100 sets of stainless steel sets of stainless steel and 100,000 tons of stainless steel pipes

79

Sanxiang disinfection wet towel and non -woven fabric

The building area is 16,000 square meters, and the annual output of 100,000 disposable disinfection wet towels and 5,000 tons of non -woven fabrics

80

Kunteng Textile fabric

The building area is 25,000 square meters, and the annual output of 10,000 tons of textile fabrics

1.8

81

Nord motor and reducer

The building area is 40,000 square meters, with an annual output of 1.6 million motors and 600,000 reducers

2.9

82

Yangzhou Chengde diameter 1422 mm seamless pipeline pipe

Reform the existing production plant, purchase a 60 -meter ring heating furnace, 1 1500 perforated machine, 1 2000 rolling machine, 1 full machine, 1 1500 diameter machine, 1 1800 detective machine, 1 4,500 tons of pressure rigid machines, 4 sets of quenching device, 8 sets of fire device, and related auxiliary equipment and facilities, an annual output diameter of 1422 mm or more seamless pipeline pipe pipes 500,000 tons tons

30

83

Tang Chujian Hua Green PC Intelligent Manufacturing

The building area is 35,000 square meters, and the annual production of PC pipelines 200,000 roots

4

84

Yingfeng powder metallurgical parts

The new production plant, R & D building, and auxiliary houses are 40,000 square meters. It is expected to produce 20,000 tons

85

Changsheng intelligent body coverage

The building area is 27,000 square meters, and the annual output of 20 million pieces of body coverage

86

Dikema Vertical shaft wind power generation technical reform

500 annual output (set) vertical axis wind power generation units

87

Thaphic Special Alkali Troupe

Newly built 6 million tons of alkaline group production line

88

Hongquan Automobile Parts

The building area is 90,000 square meters, the annual output of 50,000 units (sets), 10,000 units (sets) of rolling parts, 20,000 auxiliary frames (sets), 10,000 torque beams (sets), slower speed device 10,000 sets

7

89

Riqing spinning MKC1EVO valve block technical reform

800,000 MKC1EVO valve blocks an annual output

1.4

90

Zhongyang car seats and water tanks and other accessories

The construction area is 30,000 square meters, the annual production seat is 5,000 sets, and the water tank is 10,000 sets

91

Shengsai Sisi aluminum alloy pressure casting

The building area is 47,000 square meters, and the annual output of 30 million aluminum alloy pressure castings

92

Yangzhou Litai Industrial Automobile for lightweight aluminum alloy die -casting structural parts

Construction of 180,000 square meters of furnace workshop, die -casting workshop, precision processing workshop, logistics base and R & D center, annual output of 1 million vehicles for lightweight aluminum alloy die -casting structural parts

93

Sanno joined PET/CT assembly

The building area is 20,000 square meters, and the PET/CT machine is produced in the later year

94

Shenzhou Construction Machinery Heavy Season

The construction area is 30,000 square meters, and the annual output of heavy -duty cabs of 30,000 sets

95

然 然 然 natural spring water

The building area is 13,000 square meters, and the annual production of bottled and natural spring water 500 ml is 80 million bottles

96

British Intelligence Easy to Open

The construction area is 93,000 square meters, and the annual production drink is easy to open 29.8 billion pieces. After the first phase is completed, it is expected to open 13.1 billion pieces for annual production.

10

97

Aikim smart tire pressure monitoring system

The building area is 18,000 square meters, and the annual output smart tire pressure monitoring system is 230,000 units

98

Jiakun Automobile Parts

The construction area is 36,000 square meters, the annual output of 20,000 (sets) of the bus cabin, 10,000 (set) of the buses, 10,000 (sets) of the passenger door pump, 10,000 (set) front and rear circumference, the carriage compartment 20,000 body assembly (set)

1.3

99

Yang copper alloy copper belt

Rent 2,500 square meters, and 10,000 tons of alloy copper belts an annual output of alloy

100

Yutian fire equipment and fire protection supplies

The revitalized plant is 13,000 square meters, with an annual output of 1 million meters of fire water belt, 100,000 air respiratory device, 50,000 sets of fire robots, 1 million water -based fire extinguishers, 300,000 sets of firefighting uniforms

101

Jiewei Sports Fitness Equipment

With 13,000 square meters of the original factory, 70,000 units of fitness equipment, 94600 sets of sports equipment, and 2000,000 square meters of artificial grass

102

Dongyang hydraulic oil cylinder production

New production plant and affiliated houses are about 11,000 square meters, with an annual output of 2,000 hydraulic oil cylinders (sets)

103

Wanhui High Precision Bearing

Rent 3,300 square meters of plant, 2 million units of high -precision bearing after the project are completed

104

Guoxing plasma etching equipment

Rent 5,000 square meters of factory buildings. After the project is completed, 70 plasma etching equipment of the annual production plasma (set)

105

Qinghuan Smart Home

The building area is 270,000 square meters, and the annual output of 2.07 million smart home series products

106

Yongshuntai high -end beer malt production line

The building area is 100,000 square meters, and the annual output of 250,000 tons of malt production line

107

Nine -lit new energy passenger car body

The new plant is 14,000 square meters, and the annual output of 1,000 (set) new energy passenger car body

108

Sheng Hao Electric Electric Two -wheel Motorcycle and New Energy Vehicle Accessories

Construction of about 57,000 square meters of factory buildings and affiliated houses.

109

Baosheng truss tower inheritance board and 5G base station accessories

The building area is 40,000 square meters, and the expected output value of the truss and 5G base station accessories can reach 1 billion yuan

110

Lihan LED light band

New plant buildings are 25,000 square meters, 10 production line production lines, annual purchasing 300 million LED lamp heads, 100 million meters of glass metal wire wires, annual production of LED lights with 100 million meters, 100 million meters,

111

Xintianhe polymer polyethylene rope cable

The building area is 32,000 square meters, and the annual output of 10,000 tons of high molecular polyethylene rope cable

112

Meiju Purification Engineering Materials

The construction area is 33,000 square meters, and the annual output of 20 million square meters of engineering board

2.5

113

Hengchen’s body coverage

The building area is 20,000 square meters, the annual output of 200,000 sets of hoods, 300,000 wingspans, and 400,000 sets of front middle tailmen

114

Sunny and precision

The building area is 15,000 square meters, and the annual output of 10 million sets of various types of foot pulleys and metal precision

115

Dinghao high -end aluminum profile

The building area is 21,000 square meters, and the annual output of 50,000 tons of high -end aluminum profiles

116

Dingyu photovoltaic AR coating glass

The building area is 38,000 square meters, and the annual output of 36 million square meters of solar energy reduces reflected photovoltaic coating glass

117

Vita special precision bearing

The building area is 25,000 square meters, the annual output of 50 million sets of dual -metal rolling bearings, 10 million sets of graphite rolling bearings

118

Jiaheng Phase II Auto Parts

The building area is 16,000 square meters, and 5 million pieces of car parts are produced in an annual output

119

Liancheng Pioneering Automobile Electronic Equipment

The construction area is 80,000 square meters, the annual production of 320,000 sets of car camera system, 180,000 sets of driving recorders, 200,000 sets of car USB charging seats, 8,000 units of car multimedia integration system

2019-2021

120

And the overall kitchen and bathroom and light wall board

The construction area is 50,000 square meters, the annual output of 100,000 sets of kitchen and bathroom, and 100,000 cubic meters of light wall boards

121

Chenghua Automation conveyor sorting machine

The building area is 52,000 square meters, and the annual production automation conveyor sorter and other equipment are 200,000 units. After the completion of the second phase

122

Special Niu Power Equipment

The construction area is 40,000 square meters, and the annual production of DC stabilization power supply equipment, frequency conversion power supply equipment, and charging equipment 10,000 sets

3.5

123

Olitong’s heavy machine equipment

The construction area is 25,000 square meters, the annual output of European -style bridges, 2,000 door cranes, 3 sets of suspension platform suspension platform for aircraft maintenance hangar, 10,000 sets of European motor gourd products

124

Yongji special equipment and automatic control system

The building area is 15,000 square meters, and the annual output of 70 sets of special equipment and 50 sets of automatic control system

125

Weiguang Mechanical Metal Cut and Welding Equipment

The building area is about 8,500 square meters, and about 85 universal metal cutting and welding equipment manufacture

126

Celebration of Qingfeng flue gas desulfuric acid set set equipment

The construction area is 43,000 square meters, and the annual output of 20 sets of tobacco gas desulfuric acid is complete

127

Haibo fluid industrial pipeline valve

The construction area is 20,000 square meters, and 2,500 universities (sets) of the annual industrial pipeline valve

128

Xinyouxiang Super Special high -pressure insulation equipment

The building area is 20,000 square meters, and the annual output of 10,000 units (set)

129

Source new metal structural parts

The building area is about 35,000 square meters, and the annual output metal structure is 177,500 tons

130

Hemei Smart Home

The construction area is 40,000 square meters, the annual output of smart homes, and the overall kitchen 100,000 units

131

Hualu Metallurgical Energy Energy Sales and Environmental Protection Equipment

The building area is 20,000 square meters, and 600 (set) of annual output metallurgy and environmental protection equipment

132

And the world’s PC prefabrication component (Phase III)

The building area is 40,000 square meters, and the annual output of 300,000 cubic meters of PC pre -pre -pre -made components

133

Zhanhong Waste Roulette Disposal and Use of Waste Resum Powder

The rental production plant is 6,000 square meters, the annual waste line board can be disposed of 10,000 tons, organic resin waste 20,000 tons, and an annual output of 30,000 tons

134

Zhongcheng Building Clover Window

The building area is 70,000 square meters, and the annual output of the shutter is about 1 million square meters

135

Akim Smart Barracks Equipment

The building area is 80,000 square meters, and the annual output of 800,000 smart military camp equipment

136

Hongpeng precious metal recycling and heavy metal waste melting treatment

The construction area is 33,000 square meters, and the annual recycling processing processing 43,000 tons of microelectronics, copper nickel resources and heavy metal waste

137

Bogou oil contains oil dirt and heat solution treatment

The building area is 12,000 square meters, and the annual heat solution treatment is 44,000 tons of oil -containing sludge

138

Solid force safety protection supplies

The building area is about 20,000 square meters, and the annual output fire safety protection appliances 200,000 sets

139

Kangze Children’s Cars and Ultra -high -voltage Electric Contact

The construction area is about 15,000 square meters, the annual production of 200,000 vehicles, and 100,000 units of ultra -high -voltage electrical contactor

140

Sidaq Smart Home Control System

The construction area is 40,000 square meters, 300,000 pieces of annual sofa beds, accessories and control systems

141

Youso Food Machinery

The building area is 23,200 square meters, and 3,000 food machinery such as annual output is dehydrated vegetables

142

Light feed

The building area is 27,000 square meters, and the annual output of 120,000 tons of feed

2020-2021

2020-2021

2.3

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

2020-2022

2020-2022

2020-2022

2020-2022

2020-2022

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

3

3

3

3

3

3

3

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

1.6

1.6

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

5

5

5

5

5

5

5

5

5

5

5

2

2

2

2

2

2

2

2

2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.8

30

30

4

4

4

10

10

10

2.5

2.5

2019-2021

2019-2021

2021

1

143

Tianjin Bridge welding material

Newly built

The construction area is 70,000 square meters, the annual output of 150,000 tons of welding wire, and the scale of 50,000 tons of welding bar

2021-2023

10

2

144

Baocheng seamless steel pipe

The construction area is 23,000 square meters, the annual output is 60,000 tons of steel pipes, the lighting lamps are 15,000 groups, the traffic signal lights are 5,000 groups, and 10,000 LED lamp heads

2021-2022

5

145

Hengbang seamless steel pipe

The construction area is 27,000 square meters, and the annual output seamless steel pipe is 400,000 tons

146

Tianxiang Wisdom Light Strip

The building area is 28,000 square meters, the annual LED lighting lamps are 100,000 groups, 30,000 lamp rods, and 20,000 sets of traffic signal lamps

147

Kaiyuan Solar Smart Lighting Lantern

The construction area is 33,000 square meters, the annual production of solar smart lighting fixtures, 100,000 lamp rods, and a solar panel 16 MW

1.5

148

Xinxin Hot Galvanizing Production Line Technical Reform

The building area is 11,000 square meters, and the annual output metal surface processing processing and treatment of 100,000 tons

149

Chenyu small air -cooled diesel engine generator and unit

Construction of more than 20,000 square meters of factory buildings and subsidiary houses, annual production of small diesel engines, generators, and gears of 35,000 units

150

Sunxing Environmental Protection Nano -Digital Printing for Ink

The new construction area is 16,000 square meters, and the ink is used for printing for 13,000 tons of printing an annual output. Intelligent upgrade of existing safety and environmental protection systems to create a smart platform for the integration of the loop

3.6

151

Southeast new building decorative material

Using the factory building 6,800 square meters, an annual output of 500,000 square meters of aluminum honeycomb board

152

Tao and light alloy car wheels

The building area is 20,000 square meters, and 120,000 car wheels are produced in each type

153

Huiyu Hydraulic Machinery Manufacturing

The building area is 8,000 square meters, the annual steel gate is 3,600 tons, and 100 units (sets) are opened

154

Lingjun Environmental Protection Equipment

The construction area is 18,000 square meters, and 200 annual environmental protection equipment (set)

155

Golden Clear Automobile Parts

The construction area is 10,000 square meters, the annual production of the car interior part of the car ABS and PET board 5,000 tons

156

Longsheng special vehicle

Renewal

The construction area is 13,000 square meters, and 2,000 special vehicles are modified in the annual production and modification; the construction area of ​​the second phase is 14,000 square meters, and the annual production and modification special vehicles are 5,000

2020-2021

3

157

Yuntai Energy -saving ALC Wall

The building area is 28,000 square meters, and the annual production of ALC wall board is 450,000 cubic meters

158

Lianhuan Medical Equipment

The building area is 52,000 square meters, the annual output of 20,000 pills, 40 million units of solutions, and 8 million masks

4

159

Jinhai Precision Casting

The building area is 63,000 square meters, the annual output of 100,000 tons of casting capacity, and 200,000 tons of balls

160

Pulan Smart Fire Fighting Equipment

The building area is 18,000 square meters, and 500,000 smart fire protection equipment per year

161

Longteng Smart Lantern

The new production and affiliated houses are 148,000 square meters, with an annual output of 200,000 sets of smart street lights, smart transportation, and smart cultural tourism series

3.5

162

Concubine Green Equipment Manufacturing

The standardized plant and auxiliary houses were established 9810 square meters. After the completion of the production, it is expected to sell more than 50 million yuan in annual invoices and taxes of more than 2.5 million yuan.

163

Like Machinery Manufacturing

The standardized plant and auxiliary houses were established 6790 square meters. After completion, 4,000 units are expected to be produced by the annual output gear box.

164

Ruikai Automobile Accessories

The standardized plant is 12,000 square meters, and it is expected

165

Jin Zhiyuan high -end electric tool

The construction area is 50,000 square meters, and the annual output of 1.5 million electric electric tools

166

Xinzhengyu boiler pressure container

The construction area is 13,000 square meters, and the annual output of 150 (set) boiler pressure vessel equipment

167

Ocean precision outer packaging new materials

The building area is 13,300 square meters, and the annual output of 5,000 tons of precision outer packaging new materials

168

Fuxin Pen Industry Cultural Products

The building area is 20,000 square meters, and the annual output of 50 million pen -type products

169

Han Sheng Auto Parts thin -walled steel pipe

The building area is 10,000 square meters, and the annual output of 12,000 tons of thin -walled steel pipe

170

Hevos Medical Expansor

The building area is 15,000 square meters, and 800,000 sets of annual output of a disposable use of bronchial dilatation ball pockets, eustachian tube dilatators, vascular dilators of the limbs, and esophageal balloon expander

171

Haorui Air Purification System

The construction area is 23,000 square meters, and the annual output of 10,000 sets of air purification system

172

Guangling City Investment Building Materials and Solid Waste Treatment

The new plant area is 50,000 square meters. After the completion, it has handled various types of building materials and 2 million tons of solid waste.

173

Tike pipeline bracket

The building area is 11,000 square meters, and the annual output of pipeline bracket is 30,000 pieces/set

174

Dai Namus garbage gasification and waste wheel tire cracking equipment manufacturing

The construction area is 75,000 square meters, and the annual output of garbage gasification and waste wheel tire cracking equipment

4.5

175

Passing vehicle parts

The construction area is 90,000 square meters, the annual production of 4.5 million pieces, 1 million pieces of car lights, and 100 sets of molds

5.4

176

Yuying Home Water Purifier

The construction area is 40,000 square meters, and the annual output of 300,000 household water purifiers

177

Ancestor

The building area is 40,000 square meters, and 60 tons of soybean -processed soybean -processed soybean

3.3

1.7

178

Ouifa Automotive Interior

The building area is 35,000 square meters, and the annual output of 38 million square meters of car PVC and water -based solvents PU products

3.7

2.9

179

George Ferchel heating pipeline

The building area is 47,200 square meters, and the pipeline system of 35,000 tons of pipelines and pipelines per annual output

2.5

180

Hong Kong Jiaton Port Food

The building area is 60,000 square meters, and 120,000 tons of baked foods are produced an annual production

2020-2022

4.9

181

San Goban architectural material in France

The building area is 56,600 square meters, and the annual output of 600,000 tons of building materials

2019-2021

2.8

182

Shuchi packaging container

The building area is 15,000 square meters, and the annual output of 1.42 million containers

2.2

183

Wan Sheng half -trailer

The newly -built plant is about 10,000 square meters, and 500 semi -trailers per year

184

Weichai’s annual output of 400,000 diesel engines

In the original factory building, the production capacity improvement of the four -cylinder diesel engine production capacity is planned to produce 400,000 diesel engines with an annual output

185

Hisense’s annual output of 500,000 small refrigerators

In the original factory, the new refrigerator production line (Phase I) is planned to produce 500,000 small refrigerators per year

1.1

186

Chenjie Nineri Kaihua toothbrush and precision molds

The building area is 60,000 square meters, with an annual output of 1 billion toothbrushes, 1 million pieces of soap and 100,000 sets of hotel tourism supplies

(three)

Modern service industry

187

Yunda Jiangsu Smart E -commerce Regional Headquarters (Phase II)

Construction of Jiangsu Province Yunda Headquarters Base, with a total construction area of ​​about 580,000 square meters, focusing on the construction of two areas: 1. Intelligent e -commerce warehousing areas. Mainly build intelligent sorting centers, intelligent cloud warehouse centers, modern stereo -automated storage facilities, settlement centers, e -commerce centers, and comprehensive office buildings; 2. Intelligent logistics manufacturing area. Including automation equipment integration centers, intelligent express equipment centers, IoT automobile platforms

30

188

Red Maple Garden New Fourth Army Cultural Park

The construction area is 25,000 square meters, and the new four military cultural parks, parking lots, sports fields, etc.

1.6

189

Baoying Canal Cultural Tourism Performing Arts Center Construction

The total construction area is 53,400 square meters.

7.5

190

History and Cultural District, Yongkou Canal

The construction area is 350,000 square meters, and the construction content is: canal landscape zone; two: half, the whole marathon track; the five districts: Confucian culture inheritance area, religious cultural tourism area, Songjinghe historical and cultural district, Nanmen outside business District, Canal Park

191

COFCO Bao Ying Ying New Granary Construction and Grain Safety Improvement Project

The construction area is 100,000 square meters, and after the construction of a new grain granarium is officially operated, the annual invoicing is 1.5 billion yuan

192

Nanfeng Agricultural Intelligent Storage

Create 25,000 square meters of modern intelligent storage

193

The annual output of Wuxibao 100,000 tons of recycled metal processing

The construction area is 20,000 square meters, and the cumulative tax of 6 billion yuan in 5 years will be sold

194

Baoying New City Wuyue Smart City Plaza

The construction area is 550,000 square meters, and a large city complex is constructed

2018-2022

30.8

195

Baoying Red Star Life Plaza

Construction area of ​​178,700 square meters, build a large home complex

2018-2021

15

196

Liubao National Defense Park

Building area of ​​6000 square meters. Construction of national defense facilities and militia training bases

1.3

197

Baoying Old Dongmen Cultural Commercial Street

The construction area is 110,000 square meters, and the large -scale cultural tourism district is constructed

2020-2025

198

Baoying Wanjia International Five -Star Hotel

The construction area is 90,000 square meters, and a five -star hotel is constructed

199

Baoyue Commercial Complex

The building area is 120,000 square meters, and the commercial complex is constructed

200

Human Resources Industrial Park

The construction area is 28,000 square meters, and the construction training building is used for corporate employee training

201

Spring and Autumn Airlines East China Geographical Service Guarantee Center

The construction area is 40,000 square meters. Building Airbus A320 (A321) aircraft one -machine locations and four spray paint hangar, as well as phase supporting apron, aviation materials and tool warehouses. After the operation, the aircraft was repaired 200 and revenue of 200 million yuan. Phase II Construction Maintenance Training Center

202

Yangzhou Light Film World

The construction area is 2 million square meters, including film and television shooting, film and television shooting real scenes, studio, and racing tracks.

2018-2023

100

203

Red Star Yimei International Plaza

The construction area is 170,000 square meters, and the construction materials city and the characteristic commercial district are constructed

204

Yangzhou Shaobo Canal Heritage Protection and Cultural Tourism Construction

The Canal Heritage Heritage and Historical Districts of the Grand Canal to renovate, repair and display the Historian Heritage Heritage and Historical Districts, covering an area of ​​about 116,000 square meters; the construction of tourism vacations, gourmet leisure and other supporting facilities is about 400,000 square meters

35

205

Junchuzhong Chuangchuang

The construction area is about 270,000 square meters. As a high -end talent service Jiangdu Economic Construction Entrepreneurship, a short -term lease and transition weekly transfer house; build a provincial crowd -creation space or incubator

8

206

Jin Aohua Street

The construction area is 110,000 square meters, and the commercial district that integrates high -end business, boutique shopping, quality dining, leisure and entertainment and other formats

6.7

207

Jinyuan Commercial Plaza

The construction area is about 60,000 square meters, and a commercial square that integrates catering entertainment, business office, etc.

208

Jiangdu Wanda Plaza

The construction area is about 180,000 square meters, and the construction of Wanda Commercial Complex

209

Wanfeng Commercial Complex

The construction area is 300,000 square meters, and the commercial complex is constructed

2019-2022

210

Yanhe Xintiandi

The construction area is 89,000 square meters, and supporting facilities such as culture, science and technology, training, hotels, entertainment, shopping

2020-2023

211

Yangzhou 5G Smart Manufacturing and Integrated Application Demonstration Center

The building area is 590,000 square meters, and the 5G smart industrial chain section is mainly constructed

2021-2024

52

212

Minsheng Technology Building

The construction area is 50,000 square meters, and the construction includes a comprehensive commercial building including financial service centers and venture capital companies, Class A office buildings, and commercial podiums

213

Guazhou Huajian Interactive Experience Travel

The construction area is 100,000 square meters, and an interactive experience tourism brigade integrates scientific and technological experience and leisure and vacation.

2021-2025

16

214

Jiayuan City Plaza Phase II

The construction area is 83,000 square meters, and the five -star electrical appliances Suzhong and northern Jiangsu regional headquarters, high -end commercial business headquarters, star hotels, etc.

215

First Kaixi Yuefang Commercial Street

The construction area is 62,000 square meters, and the regional high -end commercial facilities integrate business streets, star hotels, and business offices are constructed

216

Phoenix Book City

The construction area is 40,000 square meters.

217

Jinghua City Livingmall No. 2

The construction area is 320,000 square meters, and it is planned to build a Beijing Huacheng cultural tourism facilities, including commercial, catering, theater and underground parking lots, etc.

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

2021

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

10

10

10

10

10

10

10

10

10

10

10

2

2

2

2

2

2

2

2

2

2

2

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

3.6

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

2020-2021

2020-2021

2020-2021

2020-2021

2020-2021

3

3

3

3

3

3

3

3

3

3

3

3

3

4

4

3.5

3.5

3.5

2.9

2.5

2020-2022

2020-2022

2020-2022

2020-2022

2020-2022

2020-2022

2020-2022

1.1

30

30

30

2018-2021

15

1.3

2020-2025

2020-2023

20

3.5

218

Jiayuanwen Travel Town

Newly built

The construction area is 72,000 square meters, and the cultural tourism town, which integrates outdoor scenarios, and special fashion districts.

2021-2022

12

8

219

Star hotel

The construction area is 63,000 square meters, and the branded brand boutique hotel is constructed

2021

2.8

220

Yajule Slim West Lake Daokou Complex

The building area is about 200,000 square meters, and the new commercial complex is built

2021-2023

50

5

221

Yangzhou 2021 World Horticultural Expo

Renewal

Building area of ​​30,000 square meters, construction of gardening culture display, gardening life experience, gardening livable community

2020-2021

twenty two

4

222

Middle body ice and snow complex

The construction area is 24,400 square meters, and the cold and warm areas and warm areas of ice and snow are constructed. The top of the cold zone is a new type of gas film structure, with functional partitions such as snow areas, ice areas, and entertainment areas. Display and other functional areas

4.8

1

223

Helenburg Commercial Complex

42 acres of commercial planning land and constructed 140,000 square meters of commercial complex

2020-2023

36.5

4.5

224

Deyu Tai Headquarters Economic Building

The construction area is 26,000 square meters, and the economic building of the headquarters is constructed. The annual invoicing sales are not less than 2 billion yuan, and the tax revenue is not less than 20 million yuan

3

225

Dabei neighboring center

The construction area is 18,900 square meters, and the construction of commercial centers, training institutions, banks, shopping markets, etc.

1.2

226

Yizheng Intercity Space Station

The construction area is 78,000 square meters, of which about 31,000 square meters of five -star standard hotels, and the office is about 55,000 square meters

2019-2021

6.5

1.7

227

Evergrande Crystal Plaza

The construction area is 145,000 square meters, and the construction of a complex square, including business, office, etc.

6.3

1.5

228

Taoran County Kangyang District

The construction area is 85,000 square meters, and the Kangyang community, the elderly university, the entertainment college, etc.

8.8

229

Yizheng Outdoor Balls Amusement Park

The construction area is 6,000 square meters, and the construction of entertainment facilities, entertainment experience, tourism business, etc.

230

Zhongxin Automobile Electronic Industrial Park Phase II Phase II

The construction area is 45,000 square meters, and the construction of public construction and factory buildings. The main functions of public construction are display, leisure retail, conference, etc.

231

Super Smart Logistics Industrial Park

The construction area is 40,000 square meters, and the construction of class A warehouse, class B warehouse, Class C warehouse and auxiliary houses, etc.

10

2

232

Bath Water Town Phase II

The total construction area is 3.55 square meters, and a commercial complex integrating tourism and business integration

233

Shizhu Mountain International Kangyang City

The construction area is 450,000 square meters, and a commercial complex integrating real estate, tourism, and business

2019-2022

28.2

5.1

234

Tencent East China Cloud Computing Base

The construction area is 120,000 square meters, and the data center machine room, the comprehensive building, the 220 kV self -use substation (1 seat) and the auxiliary facilities; the construction of high -power cabinets can accommodate 300,000 servers

2019-2026

100

235

Telecom Cloud Data Center

The construction area is 75,000 square meters, the land for the first phase is 60 acres, the total number of cabinets is 4,000, and the 40,000 units

2019-2023

twenty four

236

China Mobile Yangtze River Delta (Yangzhou) Data Center

The building area is 264,000 square meters, of which 6300 installed racks are installed in the first phase, and the equipment consumption is 44100 kilowatts; 29,000 aircraft is installed in the final period, and the equipment consumption is 236500 kilowatts.

2021-2025

237

Yizheng Culture and Art Center

The construction area is 45,500 square meters. The construction of a large theater, a multi -functional hall, the non -heritage exhibition hall, the cultural palace, and the youth activity center are equal to the cultural center

7.5

238

Huajian World Innovation Center North District

The construction area is 450,000 square meters. After completion

239

Yangzhou Ming and Qing Dynasties Protection and Cultural Tourism Demonstration Zone

Mainly build a deep -loop tourism route in the ancient city of Ming and Qing Dynasties in Yangzhou, rectify the river channels in the area, and promote the greening of both sides of the strait; mainly to build facade, supporting facilities, and cultural and creative space in the historical and cultural district of Renfengli; Cultural security buildings are repaired, renovated and utilized to create a demonstration zone of tourism cultural and creative industries

30

240

Zhongji Canal Center

The construction area is 494,000 square meters, and 1 headquarters base (Yangtze River Delta high -end equipment joint headquarters base), 2 research institutes (container research institutes, vehicle research institutes), 3 innovation centers (high -end equipment innovation centers, cultural and creative innovation centers, cultural and creative innovation centers 2. Entrepreneurship Incubation Service Center)

241

Jiaduhui Commercial Complex

The construction area is 47,500 square meters, which mainly builds a commercial complex and the farmer’s market

242

Baolong Yizhen five -star hotel

The construction area is 260,000 square meters, and a five -star hotel and supporting commercial facilities are constructed

2020-2022

22.4

243

Nangwu Lane Complex

The construction area is 20,000 square meters, and a 15 -storey commercial complex is constructed

2021-2024

244

Wenfeng Baolong City

The construction area is 170,000 square meters, and the construction of a fashion family cultural and commercial center

15

245

Cuiyue Xinyuan North Commercial Complex

The construction area is 10,000 square meters, and the construction office and commercial complex

246

New projects for party schools and archives of Guangling District

The construction area is 28,500 square meters, and the archives, party schools, conference centers and logistics service centers are constructed

1.6

247

Guangling Science and Technology Talent Building

The construction area is 136,000 square meters, and the office, R & D center and commercial facilities are constructed

248

Postal Hyundai Cloud Storage Center

Building 30,000 square meters, daily processing 5,000 tons of express mail

249

Yaju Le Hyatt Hotel

The construction area is 210,000 square meters, and the construction of catering facilities, entertainment facilities and office rooms

250

Hisense Science and Technology Complex

The construction area is 280,000 square meters.

251

Lotus Pond Business Center

The project covers an area of ​​about 9 acres. It is planned to build a commercial center that integrates shopping and leisure, catering and entertainment, small business markets, and business offices.

252

Yangzhou Jiangshan International Health Medical Center

The construction area is 530,000 square meters, and it is built in four phases. The first phase of the construction area is 7.1 square meters, of which: the rehabilitation hospital is constructed according to the secondary standard, set up 180 inpatient beds, and the construction area is about 16,000 square meters; Ten thousand square meters

2020-2024

32

253

Nine Dragon Lake Medical and Health City

The construction area is 400,000 square meters, and a health center integrating medical services, health care, etc., including Kanghu Building, Yi Yanglou, Logistics Center, Comprehensive Building, etc.

254

Bonded Logistics Center

The construction area is about 40,000 square meters, and the construction of a bonded logistics center

255

Jinganghui Life Plaza

The total construction area is about 48,700 square meters.

3.2

256

Yangzhou Service Robot R & D and Application Integrated Center

The construction area is 150,000 square meters, and the construction of software research and development, assembly production, robotic application, sales, and display of diversified technology application research and development and sales centers

25

257

China -Arab Reform and Development Research Center and China -Arab Cultural Exchange Base

The construction area is 80,000 square meters.

258

China Printing Museum

The construction area is 30,000 square meters, and the construction of the Chinese printing museum, the carving printing center, the eight -engraving process inheritance base and the research and development center, the boutique exhibition area, the leisure place, the conference exchange center, the master studio

259

Scenic Experience Service Industry Gathering Area

The construction area is 10,000 square meters, and the construction experience service industry gathering area includes cultural training, technical consulting, modern finance, e -commerce, new media and other industries

260

Red Garden Cultural Park Reconstruction

Building area of ​​12,000 square meters, building industrial parks mainly based on cultural innovation research and development, non -genetic inheritance protection, cultural and creative design industries mainly

261

Yangzhou Grand Canal Museum in China

The construction area is 150,000 square meters, and the four -storey museum and a 100 -meter -high “Grand Canal” are constructed.

16

262

Yangzhou Slim West Lake Cultural and Creative Tourism Development Demonstration Zone

The construction area is 700,000 square meters, mainly building a dream city and a car manor. Among them, Dream City mainly builds 5 major theme areas of Feike Dream Area, Hacker Dream Area, Detective Dream Area, Maker Dream Area, and Chaoke Dream Area. It mainly provides a leisure and entertainment product system for family parent -child leisure and vacation groups. The main construction venues, off -road experience tracks, RV camps, car theme hotels, museums and rural education camps

55

263

Yangzhou China Grand Canal Non -Heritage Cultural Park

The total construction area is about 350,000 square meters. With the theme of the canal culture, featuring Yangzhou’s non -heritage culture, and the opportunity of diversified leisure experience, the Canal City Affairs Park, Convention and Exhibition Center, Shuangchuang Park, and Grand Canal National Park are built. Formation of cultural experience, cultural performing arts, non -genetic inheritance, leisure vacation, entrepreneurial innovation, integration of non -heritage cultural industrial parks

35

264

West Lake Cultural Fund Office Park

The construction area is 14,000 square meters, and the construction fund park

265

Yangzhou Slim West Lake Ecological Health Valley

The construction area is 370,000 square meters. It mainly builds an ecological German Medical Valley Industrial Cluster Technology R & D Center, the Swiss International Medical Group, the Adelheide Health Management Center, the development of pulmonary artery high pressure stent and innovative breast CT, etc.

266

Chinese Medicine Holding Logistics Park

Construction area of ​​33,900 square meters, build cold chain logistics warehouse, emergency pharmaceutical dispatching center urgency incident processing center, pharmaceutical logistics model research center, pharmaceutical software research and development center, Chinese medicine logistics display center, etc.

267

Phoenix Water Street

The total construction area is 250,000 square meters, mainly building commercial complexes and commercial streets

268

Scientific research industry building

The construction area is 63,000 square meters, and the business office R & D building is constructed, and the food and drinks are supporting hotels.

7

269

Xinli Gion Commercial Complex

Covering a total area of ​​62,500 square meters, 8,000 square meters of commercial complexes

4.2

270

Academician expert service base

The construction area is 50,000 square meters, equipped with a complete public service facilities and commercial service facilities, relying on the beautiful natural environment of “Seven River and Eight Islands” to provide medical treatment services for experts academicians

3.8

271

Hangsheng Science and Technology Park Phase II

The construction area is 50,000 square meters.

2.4

1.1

272

Aviation Information Data Integrated Application Base in Yangzhou Aviation Research Institute

The construction area is about 500,000 square meters, and the construction of aviation data collection, storage, analysis, application and digital simulator development and application innovation bases, simultaneous supporting construction aircraft engine digital laboratory, aircraft motor laboratory, graduate school, etc.

40

273

Phase III of Yiyang Senior Service Center

The construction area is 60,000 square meters, and the construction of the elderly day care center and the affiliated buildings

2.6

274

Phoenix Island Scenic Area Promotion Reconstruction

Landscape and greening of 34 tourist attractions, ecological slope and around the island of Phoenix Island Scenic Area

2.7

275

Double Innovation Base Supporting Facilities

The construction area is 89,000 square meters, and the construction of the Yangzhou Software Park Double Incubation Base and the supporting facilities

6

(Four)

modern agriculture

276

Yangzhou pig farming breeding

-1

Champion Lake Ecological Breeding

Construction of 18,000 square meters of pig houses, 80,000 piglets in the year

-2

Shenghong pig farming

Building 76,000 square meters of pig houses, 150,000 pigs in the year

-3

Hugu animal husbandry farming breeding

The newly built pork house 100,000 square meters and office, dormitory, cafeteria, feed processing room and other supporting management rooms such as 5,000 square meters, annual breeding pigs of more than 100,000 heads

3.6

-4

Libert Pig Breeding

The construction area is about 103,000 square meters, the rental land is 300 acres, 1 new pig breeding building is built, 6,000 pigs are planted in the annual storage bar, and 1 new commercial pig breeding building is built. One station, and other living and production subsidiaries

-5

Muyuan Food River has a pig farming

The newly built pig houses 143,000 square meters and sow supporting houses, fattening houses, and temporary feed rooms such as 10,000 square meters, 250,000 pigs and pigs in the year

3.1

-6

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021

2021

2021

2021

2021

2021

2.8

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

50

50

50

5

5

5

5

5

5

5

5

5

5

5

5

5

5

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

2020-2021

2020-2021

twenty two

4

4

4

4

4

4

4

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

2020-2023

2020-2023

2020-2023

2020-2023

4.5

3

3

3

3

3

3

3

2019-2021

2019-2021

1.7

1.5

1.5

1.5

1.5

1.5

10

10

10

10

10

2

2

2

2

2

2

2

2

2

2

2

2019-2022

2019-2022

2019-2022

100

2021-2025

7.5

30

2020-2022

2020-2022

2020-2022

2020-2022

2021-2024

2021-2024

15

15

15

Xinghua Live Pig Breeding

Newly built

The building area is 130,000 square meters, and 80,000 meat pigs are produced an annual column

2021-2022

2.6

1.5

277

Muyuan Supreme Pig Breeding

The building area is 70,000 square meters, with 4,000 saves in the deposit, and 100,000 pigs in the annual column

2021

2

278

Bao Grain Grain Reserve and rice processing

Planning land 100 acres, new 100,000 tons of grain reserve warehouse and affiliated supporting projects

279

Xiaoguanzhuang Smart Agricultural Industrial Park

The construction area is 60,000 square meters, the road is 20 kilometers, and the newly -built 5,000 square meters of intelligent sheds in the newly -built single building, a 2500 -square -meter agricultural greenhouse

1.1

280

Yangxue poultry meat food processing

The building area is 45,000 square meters, the annual output is high -quality, cold and fresh, frozen yellow feather chicken 50,000 tons, and a by -product of 8,000 tons

3.6

281

Dry Tongli Energy Food Testing and Processing

The construction area is 117,000 square meters, and the project is used for agricultural and sideline products, food preservation storage and disinfection sterilization, 10MEV/20KW electronic linear accelerator annually

1

282

Gaohu eggs, agricultural and sideline products processing

The building area is 7,500 square meters, and 20 million eggs are processed and produced in the annual processing

283

Yangshou Modern Agricultural Industrial Park Core District (Phase II)

The construction area is 40,000 square meters, and 4 smart greenhouse fruits and fruits planting sheds are constructed, and agricultural technology is developed and promoted, and the planting of crops

284

Fan Chuan Scientific Research Base in the Institute of Agricultural Sciences, Lixiahe, Jiangsu

Build a national modern agricultural demonstration zone with an area of ​​1550 acres, with a construction area of ​​about 38,000 square meters. The base includes high -standard center laboratories, low -temperature species gene libraries, new crop breeding test fields, gardening crops breeding test fields, aquaculture breeding demonstrations District, circular agricultural demonstration zone and related life, production supporting facilities, etc.

2021-2025

9

two

Scientific and technological innovation

(one)

R & D platform

285

Yangzhou AVIC Industrial Machinery Communist Technology R & D Center

Renewal

The construction area is 120,000 square meters, and the construction of office buildings, training centers, expert office buildings, collaborative office buildings and park environment

2020-2023

20

5

286

Zhongqi Automobile Science and Technology Park

The construction area is 45,000 square meters, and the research and development and test bases such as the comprehensive laboratory, the intelligent connected electronics and electronics laboratory, the hydrogen fuel cell comprehensive performance laboratory

2020-2022

11.9

287

Gaoyou Fire Fighting Industry Science and Technology R & D Testing Platform

The construction area is 30,000 square meters, mainly building the fire protection industry scientific and technological innovation, product research and development, product testing, talent training and park comprehensive service platform

1.2

288

Hongwei Automobile Industry Research Institute and supporting facilities

The building area is 16,000 square meters, of which 10,000 square meters of R & D center

2021-2023

3

289

Yangjie Technology R & D E -commerce Building

The construction area is 32,000 square meters, and the global semiconductor, electronic component e -commerce platform is constructed

(two)

Science and technology park

290

Yangzhou National Power Grid Electricity Grid New Infrastructure Industrialization Base

The construction area is 98,000 square meters, and the “two platforms, one base”, that is, Yangzhou Smart Energy and Energy Storage R & D platform, the incubation conversion service platform, and the smart energy industry demonstration base

2021-2024

40

291

Yangzhou Software Park Phase I

The building area is 260,000 square meters, and the science and technology carrier mainly focuses on the Internet and software information industry

2019-2022

16.1

4.2

292

Qidi Intelligent Manufacturing Industrial Park

The construction area is 81,000 square meters. In the construction, the trial research and development building, the business exhibition center and the supporting houses are built to create a demonstration project based on smart street lights, smart parks, and digital production.

10.7

293

Electronic Information Industry Park

Construction of the standardized plant and affiliated houses of the electronic information industry base of more than 100,000 square meters. The main service platforms such as production service industry, electronic information industry bases, and comprehensive services of the park, talent training, artificial intelligence and investment and financing

10

294

Gaoyou Smart Lighting Innovation Park

Construction of 70,800 square meters of standardized factories and service supporting houses, attracting production smart lighting lamps companies to settle in

3.5

295

Aoyuan Jinghang Bay Science and Technology Innovation Center

The construction area is 560,000 cubic meters, and the construction of scientific and technological innovation, industrial incubation, business office, high -end hotels, waterfront public space are integrated high -quality dynamic urban science and technology innovation centers

50

296

Tiansheng Europe and the United States Manufacturing Industry Community Phase I

The construction area is 56,000 square meters, and the construction of automobile parts production plant, office research and development, and production support auxiliary facilities

297

Hengsheng Zhigu Industrial Community

Building area of ​​128,000 square meters, building integrated circuit chips and product manufacturing, Internet of Things technical services, and entrepreneurial space service industry communities

298

Tangwangke Chuangyuan

The construction area is 46,000 square meters, and the new framework structure plant, production testing center and affiliated house

2020-2021

1.8

1.4

299

Ji Chuangjiang Guangong Fusion Science and Technology Innovation Financial Center

The construction area is 460,000 square meters, and the three central and three central central centers of the Soviet Union, the Zhongchuang Space Park, the Science and Technology Entrepreneurship Center, and the Financial Service Center

30

8

300

Tsinghua Vehicle Networking Technology R & D and Transfer Base

The construction area is 150,000 square meters, and the entrepreneurial innovation and transformation body of the integration of Internet of Vehicles, Internet+Environmental Protection and Big Data Industry

2020-2024

4

301

Smart Municipal and Green Construction Industry R & D Headquarters Base

The construction area of ​​315,000 square meters, the construction area headquarters base and the smart municipal and green construction industry research and development innovation base

35

302

Yangzhou Huacai Science and Technology Park

The construction area is 43,000 square meters. The construction of science and technology industrial parks integrating entrepreneurial incubation and research and development experiments. It mainly introduces mechanical equipment research and development and manufacturing enterprises, automobile parts research and development and manufacturing enterprises, construction of metal accessories manufacturing enterprises, computer software and hardware research and development Manufacturing enterprise

303

Hengtong AI Science and Technology Building

The construction area is 41,000 square meters, and the construction of research and development centers, big data centers, application display centers, etc.

304

West Lake Science and Technology Park 4

The construction area is 7,000 square meters, and the introduction of the office -based service industry enterprise is introduced

305

Zhigu Technology Complex Phase II Plan B

The construction area is 60,000 square meters, creating five major service platforms for information, technology, consulting, finance, and business, appropriate supporting commercial services, business office

3.2

306

Liandong U Valley Intelligent Intelligent Manufacturing Science and Technology Park

The construction area is about 67,000 square meters.

307

European and American Industrial Park

The building area is 26,000 square meters, and a high -standard plant is constructed for mechanical manufacturing

1.3

308

Oasis Internet of Things Science and Technology Park

The construction area is 100,000 square meters, and the international advanced 4.0 innovation smart science and technology park with innovation -driven, composite operation, and production and city integration

three

Livelihood

Social cause

309

Project of relocation of technical college

The construction area is 190,000 square meters. It mainly builds the theoretical teaching building, Shuangchuang Center, Gymnasium, Student Activity Center, Training Center of Science and Technology Innovation College, etc. The supporting implementation is implemented to drainage, strong electricity, outdoor comprehensive pipe network, internal roads and landscape greening, etc.

18

310

Public training base

The construction area is 45,000 square meters, and the main construction training centers, training teaching and exhibition centers, etc.

4.8

2.8

311

Yangzhou Higher Vocational and Technical School Gymnasium, Library Construction and Campus Parking Reconstruction Project

The construction area is 22,600 square meters, and the stadium, library, etc.

312

Jiangsu Academy of Drama

According to the undergraduate level of the provincial and municipalities, the overall planning of the project at 5,000 students at the school. The planned total construction area of ​​200,000 square meters

twenty two

313

Sui Yang Emperor Tomb Site Park

11.3 Public Word Landscape and Environmental Remediation, protect the facilities of 3,000 square meters and the cultural relics exhibition hall of 55,000 square meters

2018-2022

314

Yangzhou Yihe Medical Health Center

The building area is 199,000 square meters, and 1,000 beds are set

18.6

315

Newly built in different places in Jiangdu People’s Hospital in Yangzhou City

The construction area is 400,000 square meters, of which the total construction area of ​​the first phase of the project is about 250,000 square meters, and the first phase of the hospital bed is 1500

20.5

316

Fairy Community Recreation Center New Project

The building area is 53,000 square meters, including 32,000 square meters above ground, 21,000 square meters underground, 200 beds, new community recreational centers, social parking lots, logistics services and other functions

3.8

317

Jiangdu Grassroots Health Center Reconstruction and Expansion Project

The construction area is 28,000 square meters, and new outpatient clinics, hospitalization, public health, hot ruling and affiliated houses are built. It is expected to set up 330 sheets in operating rooms, rehabilitation, hospitalization and elderly rehabilitation beds.

1.9

318

Chengnan Primary School and Affiliated Kindergarten

The construction area is 48,000 square meters. New primary schools and kindergarten classrooms, administrative office, cafeteria, wind and rain playground, underground garage, etc. Among them, the scale of primary schools is 8 or 48, and the scale of kindergarten running is 5 rails and 15 class 15 class 15 class.

2.1

319

Construction of Chengbei Education Concentration Zone

The construction area of ​​266,500 square meters: 26 rails and 78 classes in high school; 60 classes in primary school scale 10 tracks; 6 -rails in kindergarten schools and 18 classes

25.8

320

Gaoyou New City Medical and Health Center

The construction area is 44,000 square meters, and it is constructed according to the standards of the secondary comprehensive hospital, and 300 beds are set up

3.1

1.6

321

Baoying County Fifth People’s Hospital

The construction area is 16,000 square meters, and the outpatient medical technology building comprehensive building, inpatient building, public health and administrative office buildings and affiliated houses are designed for 150 inpatient beds

322

Baoying County Fourth People’s Hospital (infectious disease hospital)

The construction area is 11,800 square meters, and the outpatient department, the Ministry of Medical Technology, the Department of Hospital of Medical Technology, the Department of Inpatient, the Medical Security Department, the Administrative Management Department, the Life Service Department, and the medical personnel are isolated from the residential house.

323

Yizheng Binjiang New Town Senior High School

The construction area is 120,000 square meters, and the construction scale is 20 orbit 60

9.8

324

Provincial Medical Yangzhou Branch

The total construction area is 150,000 square meters. It mainly builds the Yangzhou Branch and the medical industry of the Jiangsu Provincial People’s Hospital. It has 400 beds, set up specialist clinics, traditional Chinese medicine clinics, proton clinical R & D test centers, academician postdoctoral workstations, proton training schools, physical examination schools, medical examinations Centers, treatment centers, scientific research centers and other diagnostic institutions

61.4

7

325

Yizheng People’s Hospital East District Branch

The building area is 155,000 square meters, and 1,000 beds are set

12.3

326

Jijiang High -tech Zone Experimental School

The construction area is 80,000 square meters. The main construction contents include ordinary classrooms, special classrooms and auxiliary rooms, public teaching rooms, life and office rooms, 400 -meter plastic sports fields, etc.

4.1

2.5

327

Mingzhou Rehabilitation Hospital

The building area is 12,000 square meters, 345 beds are designed, and more than 12 clinical departments are opened, 120 medical staff are equipped with large medical equipment such as high -pressure oxygen compartment, DR, CT and other large medical equipment. For the third -level rehabilitation specialist hospital

328

South China Kangyang Care Center

Construction area of ​​27,000 square meters, build pension, rehabilitation care and training centers

2.2

329

Medical and Nursing Federation in the Southeast area

The construction area is 70,000 square meters, and the medical and nursing consortium of Guangling Traditional Chinese Medicine Hospital, Stomatology Hospital, Medical Examination Center, Rehabilitation Hospital, and Nursing Hospital

4.5

330

The first phase of the reconstruction and expansion of Hangji Middle School

The construction area is 47,600 square meters, and the scale of the scale is 12 tracks, and 36 classes are calculated

331

Temple Campus above Yangzhou Meiling Primary School

The total construction area is about 60,000 square meters.

Livelihood

332

Jiajia Garden Five Period Valent

Building area 310,000 square meters

18.1

333

Jiulong Eighth Phase Eighth Phase Securities Settlement Project

95,000 square meters of building area

4.9

334

Guyun Phase 4 Phase B2 resettlement project

Building area 145,000 square meters

2019-2021

9.3

335

Shijing Garden Affordable Living Project

Building area 147,000 square meters

6

336

Cuiyue Xinyuan resettlement project

Building area 124,000 square meters

6.2

337

Resettlement project in Huoqiao area

Building area 437,000 square meters

338

Phase 1

Building area 115,000 square meters

5.6

339

Pearl Guangjinyuan Affordable Living House Project

Building area of ​​75,000 square meters

4.3

340

High -tech Zone No. 6 resettlement community

Building area 106,500 square meters

4.6

341

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

1.5

1.5

1.5

1.5

1.5

2021

2021

2021

2021

2021

2021

2021

2021

2021

2

2

2

2

2

2

2

2

2

2

2

2

2

2

1.1

1.1

1.1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

(one)

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

2020-2023

2020-2023

20

5

5

5

5

5

5

5

5

5

2020-2022

2020-2022

2020-2022

2020-2022

2020-2022

2020-2022

1.2

1.2

1.2

1.2

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

3

3

3

3

3

(two)

2021-2024

2021-2024

2019-2022

2019-2022

10

10

10

2020-2021

2020-2021

2020-2021

2020-2021

2020-2021

2020-2021

2020-2021

2020-2021

30

30

8

8

4

4

1.3

1.3

1.3

1.3

2018-2022

3.1

4.1

2.5

2019-2021

High Post 2021 Reconstruction of the Old Community

Newly built

The construction area is 490,000 square meters, and 10 old communities such as the old Datsu community, the cotton spinning factory dormitory, and the garden Xincun are transformed.

2021

2.8

342

Baoying County 2021-2025 Old Community Reconstruction Project

For the incomplete infrastructure of residential communities, which are not well completed by 2000, the construction area is about 600,000 square meters.

2021-2025

4.5

1

343

Baoying Trade City Farmers Market

Renewal

The construction area is 15,700 square meters, and the vegetable farms, commercial houses and accessories are built

2020-2021

1.3

344

Yizheng City Reconstruction Project in the Old Community in 2021

48 reconstruction communities, 398,000 square meters of reconstruction area, involving 3094 households

2

345

Original city primary and secondary school limited price house

The building area is about 130,000 square meters

2020-2022

9

3.5

346

Hongqi resettlement community

Building area of ​​230,000 square meters

2021-2023

10

347

Shahe resettlement community six phase six

The building area is about 140,000 square meters

2021-2022

6.8

3

348

Yandu Huayuan resettlement community

Building area 185,000 square meters

11.2

4

349

Settlement of Qingshan along the river

Building surface 105,000 square meters

2019-2022

5.5

350

Urban central agricultural trade market upgrade transformation project

The construction area is 12,000 square meters, and the farm trade market, parking lot, etc.

2.5

1.5

351

The first phase of the Jianle resettlement zone

Building area 50,000 square meters

2.7

352

Covestan resettlement area

Building area of ​​18,900 square meters

1.8

353

Reconstruction of the old community in Jiangdu City

The transformation area is about 368,000 square meters.

354

Runhuaiyuan Resettlement District, Lujiang District

Building area 140,000 square meters

6.5

355

Jiumeng’s affordable living project

Building area 105,000 square meters

4.7

356

Affordable economy of affordable economy in Xinqiao, Hangji Town

Building area of ​​36,900 square meters

Four

Ecological environmental protection

357

Gaoyoubin Lake moves Yijing Ecological Corridor

Build a Gaoyou Lake-No. 1 Gougou, No. 1 Lake-Shenju Mountain Ecological Corridor, Shenju Mountain Hot Spring Kangyang Plate, about 7 kilometers along the line, with a planned scope of about 12,000 acres

2020-2023

19.4

358

Gaoyou City’s “Four River and Four Roads” Longxuan Town Pioneer District Ecological Corridor

Construction of about 17.65 kilometers of sewage pipe network, 12 dispersed rural domestic sewage treatment stations, with a sediment of about 126,500 cubic meters, and about 7.5 kilometers of ecological protection.

1.2

359

Yizheng City Sewage Treatment Plant No. 1

Daily treatment 75,000 tons of sewage treatment plant 1 and 1 75,000 tons of sewage pumping station, with a supporting construction and exit water pipe of about 26.4 kilometers

8.5

360

Comprehensive rectification of Baoying County North Check District

9890 meters of new roads; 9 new bridges; 1 new sewage treatment plant, 32,777 meters of rain sewage pipe network, 2350 square meters of new fire stations

361

Comprehensive rectification of Sheyang Lake Human Residence Environment

It mainly includes the transformation of convenience service engineering, newly built Baoying Ecological Tourism Zone Project, Infrastructure Promotion Project, Environmental Comprehensive Remediation Project, etc.

3.6

362

Ecological Science and Technology New City Water System Comprehensive Governance Project

Han Xuhe River Remediation, Anti -Canne Water System Comprehensive Remediation Project, Core Division of the Second Phase III project of the River Embankment, Hangji Town Section of the second phase of the river embankment

363

Slim West Lake Water Environmental Governance and Functional Project

Projects such as Slimming West Lake and ensuring water dredging, slope protection, lakeside band ecological repair, and compensation water recasting

7

five

Infrastructure

364

Yangzhou Yangtze River flood prevention capacity improvement embankment reinforcement second phase project

Reinforcement embankment 94.29 kilometers; newly built and built slopes of 72.23 kilometers, and maintained 18.25 kilometers of long slopes; 84 reinforcement buildings removal; 91.3 cubic meters per second of new pumping stations; 92.86 newly built and renovated flood control roads 92.86 A kilometer, as well as the upper embankment road, dike inspections, drainage ditch, and monitoring management facilities in the corresponding dike section, etc.

42.6

15

365

Yangzhou Gate Pump Station Project

Demolition the status quo of Yangzhou Gate on the north side of the Gate, new pump station (drawing design flow is 72 cubic meters per second, draws 29 cubic meters/s) and upstream and downstream dirt clearance bridges, connecting Taiping North Road Bridge, management facilities, etc.

2.2

366

Wutaogou Comprehensive Remediation Project

Tuojun renovated 7.81 kilometers, filled 15.62 kilometers of reinforced dikes, 18 drainage pump stations, 18 electric irrigation stations, 17 culverts in culverts, 3 cross -river bridges, and land acquisition and demolition projects.

9.7

5.2

367

The expansion project of Yangzhou section of the Beijing -Shanghai Expressway

Eight -car road highway 110.5 kilometers

116.2

33.4

368

Wufengshan Cross -River Channel Highway Wiring Project Yangzhou Section

19 kilometers of eight -lane highway

2017-2021

54.1

369

Longtan Crossing Crossing Yangzhou Section

Six -lane highway, 1560 meters across the river main bridge and north leading bridge

2019-2024

22.7

370

The Yangzhou section of the north along the Yangtze Railway

89 -kilometer high -speed railway

310

5

371

Yangzhou West Outer Ring

Build a first -class highway 13.434 kilometers

20.1

372

Four Good Rural Highway Construction

New (changed) 180 kilometers of rural roads and 30 farm bridges

373

The waterway rectification project of the bridge gate from the Beijing -Hangzhou Canal to the Yangtze River port gate section section section section section

5.3 kilometers according to the secondary channel standard rectification channel

13.3

374

Nanjing to Yangzhou intercity rail transit project

The line starts from the East Stream Station of Zidong Core in Nanjing, to Yangzhou Railway Station, with a total length of 64.28 kilometers. There are 17 stations on the entire line. Among them, the total length of the Yangzhou section line is 32.76 kilometers, with a total of 7 stations

309.9

375

Tongyang Line High -Asnce Channel Rectification Project

35 kilometers according to the three -level channel standard rectification channel, build 5 bridges in rural sections and 4 bridges in the urban section

2018-2022

22.9

376

Gaoyou screen Huai Road Reconstruction Project

The total length is about 2.2 kilometers, 42-50 meters wide, two-way six lanes; simultaneous implementation of old water supply and old competent network reconstruction

2.1

1.1

377

Eastern New Town Freight Parking Lot Construction

Newly built a cargo parking lot in the Eastern New Town, covering an area of ​​about 70 acres, of which about 3,000 square meters of affiliated houses; the east extension of Wu’an East Road, the new G233 — station in front of the station, about 1200 meters long, 44 meters wide, planning control section 100 100 Mi, new road and related accessories

2.9

378

Natural Gas Emergency Peak Tun Gas Source Reserve

The area of ​​land use is about 22,300 square meters. It consists of three parts: production area, auxiliary area, and gas -added area. The main process equipment is LNG low -temperature storage tank, storage tank supercharger, unloading supercharger, air temperature gasification device , Water bath heater, EAG heaters, metering regulating pressure plus stinking device, etc.

1.4

379

S264 Sanyuan Service Area, S333 Ganxing Service Area Construction Project

The three -stack service area covers an area of ​​28.2 acres. The main construction content is comprehensive service buildings, supporting rooms, parking lots, charging piles, refueling facilities, etc.; Ganxing service area covers an area of ​​about 50 acres. Houses, supporting rooms, parking lots, charging piles, refueling facilities, logistics warehouses, etc.

1.6

380

Posthan Road Protection Project (G233 — Beijing -Shanghai Expressway)

Demolition the existing houses on both sides of the posthan road (G233 -Beijing -Shanghai high -speed) section, and at the same time improve the existing roads and related supporting facilities

381

Infrastructure Construction of Smart Lantern in Gaoyou City

In the main urban area of ​​Gaoyou, including 19 main roads and some other sections, new and renewal old roads, building smart street light networks

6.2

382

Recent governance projects in the key plain depression in the Huaihe River Basin in Jiangsu Province (Baoying Domestic Project)

Six backbone river channels in Dongdang District of Baoying County (the lower reaches of the lower reaches of the Baima Lake, Yangjiahe, the Da Sanwang River, the lower section of the Daxi River, the lower section of the Xiangyang River, and the Baoying Dahe), the total length of the river Tujun is 75.02 kilometers. Retirement, reinforcement embankment 20.02 kilometers, 23.11 kilometers of newly -built shore protection projects, 71 buildings along the construction and reinforcement, 26 cross -river bridges, and 1 Shunhe Bridge.

383

Baoying County Parking Lot

Covering an area of ​​1.747 million square meters, 35,860 new parking spaces are added

5.8

384

Xiaoguanzhuang Town, refueling gas station

Covering an area of ​​15 acres, a new refueling station is built

385

331 Baoying section connection line project (Baitian South Road)

The total length is about 2.097 kilometers, and the implementation of the first -level highway and urban main road standard organization

3.3

386

331 Baoying section connection line project (Huaijiang Avenue)

The total length is about 1.637 kilometers, and the implementation of the first -level highway and urban main road standard organization

1.7

387

331 Baoying Duan Guangyang Lake Town Connection Project

The total length of the route is about 7.752 kilometers (about 5.016 kilometers in the territory of Guangyang Lake Town, and about 2.736 kilometers in Luduo Town), and the second -level highway standard organization is implemented

388

Dongyang Road Cross -Baoge River Bridge and connection line project

The bridge is designed according to the highway-level standard and urban -A standard, with a total length of 510 meters. The wiring project is designed with first-level highways and urban main roads, with a total length of about 0.713 kilometers

3.1

389

County Road Shafan Line (Zhengdu River Bridge to Laohuaijiang Section) Reconstruction Project

The total length of the route is about 19.068 kilometers.

390

Three -line system reconstruction project

Implementation content includes: 1. Road renovation and maintenance: 23 urban sub -roads such as alignment roads, Aimin Road, Anmin Road, etc., the total length of the road is 25915 meters, and the total area of ​​312,853 square meters. The newly -built marble sidewalk 84406 square meters, demolition and construction and new stone Luton 41464 meters, replacement, repair of 51830 meters of rain sewage pipes, increase the rainwater pipe 25,915 meters, rainwater wells, replace the manhole cover, etc. 1295 street lamp cables and facilities replacement and maintenance, eliminate hidden safety hazards, and implement supporting projects such as three -line entry and greening improvement

2.6

391

Source, emission reduction, rainwater storage, power supply and communication network airlines enter the construction project

The construction range is about 28 square kilometers, involving 12 main roads and sub -roads in the urban area. The total length of the road is about 59,660 meters, of which 12 main roads are about 29,660 meters.

392

Baoying County Wind Power Power

Baoyinglu Duo 52.8 MW, Shanyang Asia New Energy 100 MW, Luduo 92.5 MW Fengli Power Generation Project, Deep Baoying Fengfeng Power Farm Project

2019-2021

28

14

393

Yizheng Port Public Pier Period Phase I

Building a 50,000 -ton bulk cargo, 40,000 tons of grocery, 5,000 -ton grocery berths each, 2 1,000 -ton grocery berths, annual passing capacity of 4.95 million tons

18

394

Hualian 100 MW Fengli power generation

The total installed capacity is 100 MW, and 50 2 MW wind power generation units are installed

7.9

395

Huadian Fuxin 50 MW Fengli Power Generation

There are about 16 wind turbines, a supporting construction of 110 kV booster stations, and building a 50 MW low wind speed wind power project

4.3

396

Conch pier bridge -type grabbing ship removal technical reform

Replace the two 800 -ton/hour bridge grabbing and unloading machines configured with the current pier to 2 1250 -ton bridge grabbing and unloading machine

397

Broaden and transformation of the East Road of the Yangtze River

From Xindu Road to the Beijing -Shanghai high -speed entrance, 3.6 kilometers long, broaden lanes, sidewalks, green belts broaden and transformation, three -tier enter the ground, rectify the environment on both sides of the road, new gardening landscape green space

4.6

398

Laohuaijiang Highway Reconstruction and Expansion Project

The total length is about 5.6 kilometers, broaden the path of transformation, and build new greening, street lights, drainage, underground comprehensive pipelines and other facilities

399

Jiangdu GCL Wu Jianfeng Electric Farm

23 wind turbines are planned and installed, 2.2 MW, and a total installed capacity of about 50.6 MW. The installation capacity is 50 mega -votic main transformers, and the supporting construction of 110 kV voltage booster stations

4.4

2.4

400

Huoqiao Smart New City Basic Road Network Phase I

The four smart new city roads in Weiyi Road, Baolin Road, Fumin Road, and Wenhui Road, a total length of about 5.2 kilometers

401

Ecological Science and Technology New Town Ring Island Landscape Avenue

The total length of Xinwanfu Road to the Phoenix Island Ecological Park (Tai’an section) is about 10 kilometers long, and the G40 Liaojiagou Bridge to G40 Mangui River Bridge is about 12 kilometers in length of the north of the northern riverside border (Hangji section)

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

Newly built

2021

2021

2021

2021

2021

2021

2021

2021

2.8

2.8

2.8

2021-2025

2021-2025

2021-2025

4.5

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

2020-2021

2020-2021

2020-2021

2020-2021

2020-2021

2

2

2

2

2

2

2

2

2

2020-2022

2020-2022

2020-2022

2020-2022

9

3.5

3.5

3.5

3.5

3.5

3.5

2021-2023

2021-2023

2021-2023

2021-2023

2021-2023

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

扬州市2021年市级重大项目清单

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

2021-2022

3

3

3

3

3

2019-2022

2019-2022

2019-2022

2019-2022

2.5

2.5

2.5

1.5

1.5

1.5

1.5

2.7

1.8

2020-2023

2020-2023

2020-2023

1.2

1.2

2.2

5

5

5

1.1

2.9

1.4

1.4

5.8

2

1

402

Phoenix Island Road Reconstruction

Renewal

From Xinwanfu Road in the south, to Ningqi Railway in the north, with a total length of 7.9 kilometers and a width of 35 meters

2020-2022

2.4

1.8

403

Ecological Science and Technology New City Comprehensive Road Network Promotion Project

Newly built

Dongzhuanghe Road, Hengsan Road, Han Xuhe Road, Xiaqiao Road, Sanxiao Avenue Nanyan Road Network Construction, the total length exceeds 2 kilometers

2021-2022

2.3

404

Wuzhou East Road Reconstruction and Expansion

Wuzhou East Road asphalt is out of asphalt, green migration, traffic safety, monitoring and other subsidiary facilities, local maintenance, local rain and pollution pipeline maintenance

405

The rapid transformation project of the North and South Road of the canal (Wanfu Expressway-Shijing Road)

The newly -built Main Six Auxiliary Six Expressway is 3.1 kilometers, of which the tunnel is 2.53 kilometers long

2019-2021

16.8

6.5

406

Canal North Road and Wanfu Road (Wanfu Bridge -S611) Fast Construction Project

New Expressway 11.28 kilometers

35.6

11.5

407

Runyang Road Fast Transformation Project (Runyang Road-Jiangyang Road Interchange)

Newly built Runyang Interchange 1.9 kilometers

2018-2021

408

Runyang Road Fast Transformation Project (Pingshan Hall Road-Baiji Lane)

The newly -built Main Six Auxiliary Six Expressway is 4.12 kilometers, of which the tunnel is 2.58 kilometers long

28.8

14

409

Runyang North Road (Jiangping Road Phase II -Qiyang Expressway Shugang Interoperability) Fast Transformation Project

The total length is about 1.28 kilometers. The main line is the urban expressway. The design speed is 80 kilometers per hour, and the two-way 6-8 lanes are designed. Branch, design speed 30 km/h

2020-2021

3.3

1.6

410

Jiangping East Road Fast Transformation Project (Canal West-Pingshan North Road East)

The total length is about 5.6 kilometers, and the width of the road is 50 meters -73.2 meters; according to the urban expressway standard, the main six-help six road horizontal surface, the main line is 80 km/h, the auxiliary road speed is 50 km/h

19.8

5.6

411

Jiangping West Road Construction Project

The total length is about 8.2 kilometers, and the width of the road is 50 meters -71.5 meters; according to the city’s expressway standard, the main six-assistance and six roads cross the surface, the main line is 80 km/h, the auxiliary road speed is 50 km/h

32.7

9.8

(Yangzi Jiangbei Road-Cuigang Road)

412

Yangtzejin Road West Yan

The total length of the first phase (Runyang Road-Gan Eight Line) is about 4.47 kilometers, and the “Main Six Supplemented and Four” Expressway; the second phase (Gan Eight Line-345 National Highway) is about 3.5 kilometers in length, including one crossing Uta Gougou Bridge. The total length of the bridge is 490 meters

2020-2023

11.7

5

413

Yangtze River Road Standardized Capital Reconstruction Project (Ironoma -related section)

On the basis of the Ningqi Railway under Yangtze River Road, there are four holes (8 meters+2×12 meters+8 meters) on the Yangtze Railway, appropriately revisit and expand one hole at a hole at the western end, and expand a 9 -meter frame of one hole in the east. The supporting municipal pipeline moves in advance to the lower sides of the railway over and over the railway and do a good job of reserved work.

1.5

414

Jiangping East Road East Extension Construction Project

The total length is about 7.2 kilometers. It uses the main and auxiliary separation of the main six auxiliary and six sections. The standard width is 74 meters. The main line design is 80 kilometers per hour. Duan, about 2.6 kilometers long)

5.9

3

(Canal North Road Interchange-Jinwan Road Interchange) The first phase of the project

415

Development Road East Extension Capital Reconstruction Project

Development Road East Extension Capital Reconstruction Project (National Highway to 328) is a city expressway. It is arranged according to the section of the main aid road. The main line is a two -way 6 -lane city expressway with a design speed of 80 km/h; Road, design speed 50 km/h

2020-2024

10

416

Yangzhou 5G Network Construction Phase II Phase II

Complete the installation of about 4,000 5G main equipment, and complete the construction of the corresponding support

2021

2

2

1

1

1

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

Renewal

1.8

Newly built

Newly built

Newly built

2021-2022

2021-2022

2019-2021

2019-2021

2019-2021

2019-2021

11.5

2020-2021

10

10